Účinnost a trendy datového centra 2013, část II

Data Center Efficiency Survey

ServerLIFT® LLC conducted an anonymous survey at a large technology trade show to determine data center efficiency specific to equipment handling practices.
Respondents were asked to complete a questionnaire consisting of six questions that related to daily operations in their data center. All survey information was anonymous to encourage participant honesty and minimize bias.

Trends:

The data indicated that using ServerLIFT® products was far more efficient method of handling IT equipment than using generic warehouse lifts; translating into significant cost savings for data centers. For the purpose of this survey, data center efficiency was defined as the number of man-hours required to install a server in a rack. Data centers using generic warehouse lifts are losing approximately 1 man-hour per equipment move, resulting in higher operating costs. Results are illustrated in the graphs below¹.

Width = 906px Height = 266pxEfficiency Graphs Combined

Equipment Weighing More Than 50 lbs:

1. 70% faster install times with a ServerLIFT® vs. a generic warehouse lift
2. Required, on average, approximately 1 man-hour (58.13 minutes) less with a ServerLIFT®

Number of Moves a Month

Lost Man Hours Per Year

Cost Savings Per Year

5

58.13

$4,359.75

10

116.26

$8,719.50

15

174.39

$13,079.25

20

232.52

$17,439.00

25

290.65

$21,798.75

¹ Savings were calculated strictly from the results of the survey and based solely on estimated lost man – hours. Other differentiators such as ease of use, risk reduction, suitability for the task and improved handling safety were not evaluated as part of these results. A VMWare survey of customers’ operational efficiency citing the company’s internal cost calculations specified the fully-burdened cost of system administrators to be $75 per hour. This number was used to project the cost savings achievable with a ServerLIFT®.

Doporučené příspěvky

Tech LIFT

7 Ways Tariffs Will Impact Data Centers

Tariffs will affect data centers and the broader economy. Impacted data center operations include equipment sourcing, facility location choices, and strategic decision making.  Data

zadejte níže uvedené informace a stáhněte si whitepaper

Průvodce migrací datového centra

zadejte níže uvedené informace a stáhněte si whitepaper

Průvodce bezpečností datových center

zadejte níže uvedené informace a stáhněte si whitepaper

Doporučené postupy pro přesun IT oddělení v datovém centru

zadejte níže uvedené informace a stáhněte si whitepaper

Osvědčené postupy pro manipulaci se zařízeními datových center

zadejte níže uvedené informace a stáhněte si whitepaper

dokument white paper konsolidace akčního plánu konsolidace dat

zadejte níže uvedené informace a stáhněte si whitepaper

Nákup zdvihacího zařízení datového centra