2013 Data Center Efficiency & Trends Part II

Data Center Efficiency Survey

ServerLIFT® Corporation conducted an anonymous survey at a large technology trade show to determine data center efficiency specific to equipment handling practices.
Respondents were asked to complete a questionnaire consisting of six questions that related to daily operations in their data center. All survey information was anonymous to encourage participant honesty and minimize bias.

Trends:

The data indicated that using ServerLIFT® products was far more efficient method of handling IT equipment than using generic warehouse lifts; translating into significant cost savings for data centers. For the purpose of this survey, data center efficiency was defined as the number of man-hours required to install a server in a rack. Data centers using generic warehouse lifts are losing approximately 1 man-hour per equipment move, resulting in higher operating costs. Results are illustrated in the graphs below¹.

Width = 906px Height = 266pxEfficiency Graphs Combined

Equipment Weighing More Than 50 lbs:

1. 70% faster install times with a ServerLIFT® vs. a generic warehouse lift
2. Required, on average, approximately 1 man-hour (58.13 minutes) less with a ServerLIFT®

Number of Moves a Month

Lost Man Hours Per Year

Cost Savings Per Year

5

58.13

$4,359.75

10

116.26

$8,719.50

15

174.39

$13,079.25

20

232.52

$17,439.00

25

290.65

$21,798.75

¹ Savings were calculated strictly from the results of the survey and based solely on estimated lost man – hours. Other differentiators such as ease of use, risk reduction, suitability for the task and improved handling safety were not evaluated as part of these results. A VMWare survey of customers’ operational efficiency citing the company’s internal cost calculations specified the fully-burdened cost of system administrators to be $75 per hour. This number was used to project the cost savings achievable with a ServerLIFT®.

Рекомендовані повідомлення

Технологія LIFT

Data Center Safety In 2024: 8 Key Components

Data centers can be dangerous, even for experienced workers. There are plenty of opportunities for something to go wrong, with electrical work, fire and

введіть інформацію нижче, щоб завантажити документ

Посібник з міграції центру даних

введіть інформацію нижче, щоб завантажити документ

Посібник з безпеки Центру обробки даних

введіть інформацію нижче, щоб завантажити документ

Кращі практики пересування ІТ-відділу в Центрі обробки даних

введіть інформацію нижче, щоб завантажити документ

Кращі практики по роботі з обладнанням центру обробки даних

введіть інформацію нижче, щоб завантажити документ

план дій щодо консолідації центрів обробки даних

введіть інформацію нижче, щоб завантажити документ

Купівля пристрою підйому центру обробки даних