数据中心的灾难恢复:
自然灾害是生活的事实。每年他们很少发出警告,却散发出难以置信的暴力。拆除任何跨越其道路的东西。这些“上帝的作为”不会发挥自己的最爱,也不在乎它们可能会毁掉什么。它们是不可预测的,不可靠的且不可更改的。
就像您一样,我选择住的地方,公司选择他们的住所 数据中心 重点放在发生自然灾害的几率上。就像您和我一样,这些公司可能会选择或被迫在可能发生灾难的地方建造或搬迁。
Inevitably data centers will be built in locations that seasonally face the wrath of mother nature and because of this disaster recovery plans (DRP) – sometimes referred to as a business continuity plans (BCP) or business process contingency plans (BPCP) – have to be put in place, in order for organizations to have a plan describing how to deal with potential disasters.
Just as a disaster is an event that makes the continuation of normal functions impossible, a disaster recovery plan consists of the precautions taken so that the effects of a disaster will be minimized and the organization will be able to either maintain or quickly resume mission-critical functions. Typically, 灾难恢复计划 涉及业务流程和连续性需求的分析;它也可能将重点放在防灾上,甚至 数据中心迁移.
根据行业标准,在灾难发生时,有三种处理灾难的方法:
- 热灾难恢复站点:
这些站点适用于本质上非常关键的应用程序和服务,在灾难期间不会冒任何停机的风险。银行数据中心,在线交易站点或股票/股票数据中心等业务关键服务需要此方法。热灾难恢复站点必须在灾难恢复站点上具有所有服务的联机备份。万一发生灾难,灾难恢复站点将启动连接,并且业务将在最短时间内恢复运行。但是,由于数据中心已镜像到DR数据中心位置,因此这种方法非常昂贵,并且需要大量投资。 - COLD DR网站:
Cold DR站点具有到主要数据中心服务器和服务的异地备份,如果发生灾难,将在新购买和安装的服务器上还原备份。这些站点的服务恢复延迟时间很慢,通常将无法恢复活动长达一周或更长时间。这些特定站点中涉及的规划是最小的,只需要为DR移动标识一个空间并构建基本的基础结构。 -
温馨灾难恢复站点:
热灾难恢复站点混合了热灾难恢复解决方案和冷灾难恢复解决方案。由于成本限制或应用程序依赖性,仅考虑将某些应用程序用于灾难恢复。 RTO最多几天。将根据优先级或严重性来恢复服务。为了控制成本,仅考虑将关键任务应用程序用于热灾难恢复,而其他应用程序将移至灾难恢复站点或进行重建,以免发生灾难。
根据最大容忍中断(MTO)考虑方法。 MTO是组织可以容忍的中断时间。发生时间少于此期间的任何事件都不能视为灾难。但是,如果事件确实超出了MTO,则数据中心管理人员将调用DR计划,从理论上减轻企业的影响。
如果您要进行数据中心迁移,请参阅以下有用的文章 数据中心迁移步骤.