In this newsletter, we discuss how ServerLIFT data center lifts and attachments help create a safer work environment and enable fast shipping lead times so you get them sooner (but don’t wait too long). We also recognize NVIDIA for achieving one of its climate goals.
1. 7 ServerLIFT Data Center Lift Advantages
ServerLIFT purpose-built data center lifts prioritize safety with enclosed winch systems and TouchStop sensing. Customers report our lifts are the safest they have used.
Our data center lifts perform the three essential tasks of transporting, positioning, and installing or removing IT equipment, while navigating tight aisles and standard elevators.
Models and attachments adapt to different environments and loads, enabling data center teams to customize for specific jobs.
ServerLIFT data center lifts help improve uptime and productivity, deliver fast ROI, and reflect real-world feedback in ongoing design refinements.
2. NVIDIA Achieves Climate Milestone
In fiscal 2025, NVIDIA powered all its offices and data centers with 100-percent renewable electricity and made its packaging 97-percent recyclable.
Nvidia pledged to reduce its Scope 1 and 2 emissions by half by 2030 and to lower customer‑side electricity use from its chips by 75 percent through its Blackwell platform, which delivers up to 25 times better energy efficiency for large AI models.
Nvidia is partnering with firms such as Microsoft and CoreWeave to build AI data centers and is making its climate agenda part of its core business strategy.
3. ServerLIFT Data Center Lift Attachment: RL-500™ Platform Riser
The RL‑500™ Platform Riser fastens to the platform of any ServerLIFT data center lift via four thumb screws, allowing quick installation and removal.
Once installed, the attachment raises the usable platform height by 12 inches (about 30.48 cm), effectively bridging the gap between the lift’s top and its platform and enabling seamless top‑of‑rack installations.
It supports up to 500 lb (227 kg) and works with all ServerLIFT data center lifts.
4. Fast Shipping Times Continue
As long as we have a PO and other required paperwork, the shipping time for orders of 10 or fewer data center lifts is 2 – 4 weeks.
We have conducted several on-site visits with customers over the past few months to connect personally and to help them get the most out of our data center lifts. If we haven’t visited your data center yet, and you would like us to, please call us in the US and Canada: 844-209-2674 All Other Countries: 602-254-1557.
Береги себя,
John Spillane, CEO
ServerLIFT LLC
US and Canada: 844-209-2674 All Other Countries: 602-254-1557
Miss an issue of this newsletter? Check out back issues Вот.
Reviews really help us out. Please share your experience with ServerLIFT Вот.

