ServerLIFT® LLC conducted an anonymous survey at a large technology trade show to determine data center efficiency specific to equipment handling practices.
Os entrevistados foram solicitados a preencher um questionário composto por seis perguntas relacionadas às operações diárias em seu data center. Todas as informações da pesquisa eram anônimas para incentivar a honestidade dos participantes e minimizar o viés.
Tendências:
The data indicated that using ServerLIFT® products was far more efficient method of handling IT equipment than using generic warehouse lifts; translating into significant cost savings for data centers. For the purpose of this survey, data center efficiency was defined as the number of man-hours required to install a server in a rack. Data centers using generic warehouse lifts are losing approximately 1 man-hour per equipment move, resulting in higher operating costs. Results are illustrated in the graphs below¹.
Largura = 906 px Altura = 266 px
Equipamento com peso superior a 50 libras:
1. Tempos de instalação 70% mais rápidos com um ServerLIFT® vs. um elevador de armazém genérico
2. Necessário, em média, aproximadamente 1 hora-homem (58,13 minutos) a menos com um ServerLIFT®
Número de movimentos por mês |
Horas de homem perdido por ano |
Economia de custos por ano |
5 |
58.13 |
$4,359.75 |
10 |
116.26 |
$8,719.50 |
15 |
174.39 |
$13,079.25 |
20 |
232.52 |
$17,439.00 |
25 |
290.65 |
$21,798.75 |
¹ Savings were calculated strictly from the results of the survey and based solely on estimated lost man – hours. Other differentiators such as ease of use, risk reduction, suitability for the task and improved handling safety were not evaluated as part of these results. A VMWare survey of customers’ operational efficiency citing the company’s internal cost calculations specified the fully-burdened cost of system administrators to be $75 per hour. This number was used to project the cost savings achievable with a ServerLIFT®.