Data Center Infrastructure Management (DCIM)

Infrastructure Management of the Data Center:

The Datacenter Game Changer


Data Center Infrastructure Management is taking the industry by storm. It is predicted that by 2014, 60% of corporations will have implemented the use of DCIM; a huge leap from the mere 1% in 2010. With
statistics like these, there is no question that DCIM is more than just an offshoot of the green IT initiative.

Originally created to fill a need to understand and reduce energy consumption, DCIM has evolved into a solution that integrates IT physical infrastructure management, facilities management, and systems
management, transforming how the IT ecosystem is seen and managed. A true DCIM solution is a game-changer.

So What Does All of This Really Mean?

Data Center Infrastructure Management, when it is the right solution from the right vendor, can enhance the performance, efficiency, and business value of the data center and help to keep it seamlessly aligned with the needs and agenda of the corporation.

DCIM Can Help Decision-Makers:

  • Provide a 3-dimensional map of the data center infrastructure which displays where all IT equipment and servers are located. In turn making it easier for technicians to install new equipment, as they have a clear direction and idea as to where the equipment is to be installed.
  • Align IT to the needs of the business and create a viable way to maintain that alignment, no matter how radically those business requirements may change and grow
  • Automate capacity planning with unparalleled forecasting capabilities, including the use of “what if” scenarios.
  • Visualize, locate, and manage all of their physical assets within an integrated “single pane” view of the entire infrastructure. DCIM gives a clear assessment of the entire inventory in the data center by showing the whole infrastructure on a single monitor.
  • Reduce energy consumption, utility costs, and carbon footprint – saving the planet while potentially saving millions
  • Allow data center technicians to monitor individual servers and equipment, giving staff more time to respond to the needs of the equipment.

However, not all DCIM vendors are created equally. IT decision-makers must carefully evaluate the products and promises made by each vendor before being able to accurately choose an option to best fill their company’s needs. They must, essentially, strip away all of the misconceptions and myths that frequent the DCIM market.


As important as choosing and implementing the best suited DCIM software is, it is also equally as significant to have a method in place for the physical moving and lifting of servers, racks, and gear within the datacenter. Without the employment of proper tools, the increased efficiency generated by the usage of DCIM software and technologies is diminished. Hence, completely undermining the original value created, consequently altering the actual level of efficiency and performance predicted. Bearing this information in mind, most Fortune 500 companies have come to realize the necessity of using a tool such as a server lift to assist in maintaining overall efficiency and performance. The implementation of these products into data centers has not only boosted efficiency, performance, and safety, but overall HIPAA data center compliance as well.

The Bottom Line:

The physical layer has increasingly become the single point of IT operational dependency in a world of increasing convergence. DCIM is the natural evolution of this process. The physical layer is now being treated with the same level of priority as the logical layer. Investments in managing the logical layer are shifting to investments in managing the physical layer.


*DCIM is defined by Gartner as the integration of information technology(IT) and facility management disciplines to centralize monitoring, management and intelligent capacity planning of a data center’s critical systems. Achieved through the implementation of specialized software, hardware and sensors, DCIM will enable a common, real-time monitoring and management platform for all interdependent systems across IT and facility infrastructures.

Server Handling Precautions and Procedure Suggestions

Handling Servers:

The Good, the Bad, and the Ugly


There is no one way to lift and move a server. Sure some ways may be more effective, safer, and more efficient, but that doesn’t mean that they’re used. In fact it is completely normal for a data center to expect one or two of their IT techs to lift and move around hundreds of pounds of equipment on a regular basis. Now try to imagine all of horrible scenarios that can occur when two people, who aren’t professional movers or body builders, attempt to lift a server… All of those terrible things that you just thought in your head have and will occur… Drinks spill and take out entire facilities, fork lifts drop millions of dollars’ worth of equipment, techs use spinning office chairs to try and reach servers on the top of racks, I could go on and on…

I thought I would begin this blog post on server handling, with some horror stories from data centers. Yes, these all are true and really did happen and yes, these are educated, intelligent people that preformed these not so intelligent human tricks instead of using the right tools for proper server handling techniques.

  • A jet of Freon shoots out of a disconnected air conditioning line in the middle of the data center, spraying rows of rack-mounted servers (“with a frantic tech trying to stem the flow with his bare hands”, says the storyteller) resulting in a building evacuation.
  • A university lab testing speech perception in quails (yes, the small ground birds) is forced to close temporarily after a homegrown backup program that hadn’t been beta-tested brought down systems for two weeks and wiped out five months of data.
  • A server room suffers 100-degree-plus conditions, even though the thermostat was set to 64 degrees. The problem– someone changed the setting from Fahrenheit to Celsius. The result? Melted drives.
  • When helping a construction site set up their computer network, a consultant instructed the project manager at the construction site to “install the server in a secure and well-ventilated location.” Apparently the definition should have been slightly more fool-proof. When the consultant arrived on site, the equipment was set up inside the men’s bathroom in a construction site trailer.

Two of my favorite data center horror stories were amazingly recorded and posted on YouTube. For your entertainment and viewing pleasure, I give you “Dropping A Server” & “Accident In The Server Room”.

VIDEO ONE: “Dropping A Server”- Two IT techs accidentally drop a $5000 server…

VIDEO TWO: “Accident In The Server Room” An IT tech finds out the hard way why using a spinning office chair to replace a server is a bad idea

Server Handling Precautions

So how do you avoid these nasty situations? Well, let’s begin by looking to Oracle, a corporation that specializes in servers and other computer technology. According to their server handling precautions, Oracle recommends that two individuals handle servers that weigh over 50 lbs. But as I said earlier, that usually doesn’t turn out too well…

OSHA states in their Technical Lifting Manual that an employer should consider the principal variables in evaluating manual lifting tasks to determine how heavy of a load can be safely lifted. Some of these variables include: the horizontal distance from the load to the employee’s spine, the vertical distance through which the load is handled, the amount of trunk twisting the employee utilized will be doing during the lifting, the ability of the hand to grasp the load, and the frequency with which the load is handled. As informative and well-meaning as these guidelines intend to be, chances are slim that anyone actually follows them.

You are probably starting to realize that there aren’t too many server handling guidelines or procedures in place to instruct data centers or IT techs on how to conduct a server move and equipment safely during replacements, data center migrations, or other common projects. However, one answer to this huge mess is to employ the use of a specialized server handling solution. No, I’m not talking about a fork lift or some other piece of equipment that is used in a warehouse environment; I’m talking about a lift that is designed specifically for the data center environment.

The SL-500X ServerLIFT is an innovative piece of equipment that, when used, relieves most of the stress and problems associated while handling servers and other rack-mounted equipment. This device can lift up to 500lbs to a height of 8 ft, which eliminates the need for the spinning office chair. It has a slim design, which easily navigates through the aisles and racks and is side loading to make placing servers in cabinets easier. In most cases, only one individual is needed to operate the lift, increasing efficiency, and its well thought out design makes it easy for any IT tech to use. Please contact us for a Server LIFT price quote!

So, am I self-promoting a little bit today? Yes, but for good reason. Server handling is one of the most important tasks in a data center. Think about it, without the servers, there would be no data center. Does expecting two techs to manually move the servers themselves make sense? Not really. But can it be done? Sure. Decide for yourself what you think the best option would be. I leave it to you, but remember what happened in the videos above when you are making your decision.